Project Azalea (Thomson Data Center Campus)

Project Turbo, LLC (developer; end user undisclosed) · Thomson, GA · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
Randall Hunt Road
Coordinates
33.4663248, -82.5026089
Serving utility, source-reported
Jefferson Energy
Operational capacity, source-reported
Not published
Planned capacity, source-reported
400 MW
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Permitted

    McDuffie County commissioners voted 4-1 to approve, after a planning commission recommendation earlier that month.

    Underlying source

Source notes

Six data center buildings at 2660–2358 Randall Hunt Road, Thomson; potential completion 2029. Developed by Project Turbo, LLC, the same entity behind the separately tracked Gainesville/Hall County proposal — this is a distinct McDuffie County site, not that project. Coordinates are the Thomson city centroid (OSM Nominatim); the street is recorded without a number because the parcels span an address range.

Planned 400 MW supply from Jefferson Energy. The Central Savannah River Area Regional Commission's DRI report states sufficient energy supply is not currently available to serve the project; studies are ongoing with Georgia Power, Georgia Transmission Corporation and the EMC.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.