Project West (Troup County Data Center Campus)
Undisclosed data center developer (landowner Joshua Harrelson) · LaGrange, GA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.039291, -85.0313269
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 600 MW
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Development of Regional Impact filed for a six-building, 1.5 million sq ft campus on 513 acres of unincorporated Troup County, with a requested annexation into the City of LaGrange. Phases targeted for 2028, 2030 and 2033.
Underlying source
Source notes
Six buildings at 252,000 sq ft each, $9.7 billion over eight years, 600 MW, with its own substation. As of October 2026, no job count is recorded. This is a separate site from Google's LaGrange data center, which is at 411 Pegasus Parkway off I-85 and was announced in April 2026 by Google itself; as of September 2026, the tracked Google LaGrange Data Center record covers that one. As of October 2026, Baxtel reports that the project has seemingly stalled after the LaGrange City Council denied a request to annex the property into the city; no cited source reports the application withdrawn or cancelled, so the record stays listed as proposed. Coordinates are approximate to LaGrange.
Sources and provenance
- Massive $9.7 billion data center proposed in Troup County · source retrieved 2026-09-10
- Project West (Baxtel facility record) · source retrieved 2026-10-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.