Prologis Project Mila
Prologis · Trenton, OH · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.48, -84.4638
- Serving utility, source-reported
- Duke Energy Ohio
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 250 MW
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
Trenton planning commission unanimously approved Prologis 'Project Mila' (4 × 220k sq ft buildings + on-site substation) in March 2026; construction from fall 2026
Underlying source
Source notes
Project Mila in Trenton, Butler County (outside Cincinnati): four 220,000 sq ft single-story buildings (880k sq ft total) plus an on-site substation. Planning approved March 2026; construction from fall 2026. Local reporting in 2026 (Journal-News, WYSO) describes a 250-megawatt data center, recorded as planned capacity. Prologis estimates the project will create 120 full-time jobs by December 31, 2035 (Journal-News, WYSO); as an estimate, it is not recorded as a job count. Distinct from Prologis's Newnan, GA campus. Coordinates are the Trenton area centroid.
Sources and provenance
- Prologis details plans for data center campus outside Cincinnati, Ohio · source retrieved 2026-07-07
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Journal-News — "What to know about Trenton's proposed data center tax incentives" · source retrieved 2026-09-21
- WCPO — "Trenton Planning Commission approves data center site plan in 10-minute meeting" · source retrieved 2026-07-25
- Stop Ohio Data Centers — Butler County / Project Mila tracker · source retrieved 2026-07-25
- WYSO — "Trenton approves 15-year tax abatement for data center" · source retrieved 2026-07-25