Project Steel Data Center Campus
Prologis · Yorkville, IL · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 41.699, -88.484
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-12
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
Yorkville City Council approved annexation, rezoning from R-1 to M-2, and the preliminary/final PUD on 24 March 2026, with one dissenting vote.
Underlying source
Source notes
Petitioner Prologis, L.P. as contract purchaser across 16 parcels totalling roughly 540 acres east of Eldamain Road between Corneils Road and Galena Road. Plans as revised in March 2026 call for 16 data center buildings totalling over 9 million sq ft plus three electrical substations, built in three phases over about 20 years, with first-phase construction anticipated in summer 2027. Power capacity has not been disclosed. Coordinates are the centre of the described parcel boundaries and are approximate.
Sources and provenance
- Project Steel Data Center Campus (Annexation Agreement, Rezone, Preliminary PUD & PUD), case 2025-07 · source retrieved 2026-09-12
- Yorkville City Council Approves "Project Steel" Data Center Amid Resident Opposition · source retrieved 2026-09-12
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.