Antelope Data Center (Project Antelope)
Pronghorn Development LLC · Cedar City, UT · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 37.6775, -113.0619
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1500 MW
- Source record updated
- 2026-09-04
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
Iron County Planning Commission unanimously approved a conditional use permit.
Underlying source
Source notes
West of Cedar City along Antelope Springs Road; permit deemed vested ahead of the county's 180-day data center moratorium; development planned in phases over 8-10 years; up to 6.75M sq ft at full buildout. Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy. Iron County Planning Commission minutes for the 4 June 2026 conditional-use approval state "This CUP is not tied to any tax incentives or reimbursements", and no Iron County community-reinvestment project area was found covering this site, which lies in unincorporated Iron County outside Cedar City's municipal limits. The applicant's consultant told the commission their tax-revenue estimate was modelled both "with the Inland Port incentives and without", which is a future incentive being contemplated by the developer, not an awarded one.
On-site natural gas-fired power plant planned to serve the campus.
Sources and provenance
- Planning Commission approves conditional use permit for proposed Iron County data center · source retrieved 2026-08-25
- Proposed Data Center Information — Iron County · source retrieved 2026-08-25
- Planning commission considers AI data center near Cedar City · source retrieved 2026-09-01
- Iron County Planning Commission minutes, 4 June 2026 — Antelope data campus conditional use permit · source retrieved 2026-09-04