Provident Burns Harbor Data Center Campus (Worthington Steel property)

Provident Realty Advisors · Burns Harbor, IN · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.61, -87.12
Serving utility, source-reported
NIPSCO
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-16

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Preliminary hearing before the Burns Harbor Advisory Plan Commission on Provident's petition to rezone ~102 acres on the west side of Babcock Road to a new Special District 8 (technology).

    Underlying source

Source notes

About 102 acres owned by Worthington Steel on the west side of Babcock Road. Initially five buildings at ~30 employees per building. Separate from Provident's withdrawn Chesterton proposal. Current status is uncertain: no 2026 action was found, and secondary trackers describe it as stalled or revised. Coordinates are approximate.

Petitioner's attorney told the plan commission the site was chosen for nearby high-tension lines and that agreements were in place with NIPSCO.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.