Lifecycle
CancelledSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
43.2428, -89.3401
Serving utility, source-reported
Alliant Energy
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    QTS publicly announced the Dane County hyperscale campus; zoning and annexation applications submitted to DeForest in November 2025

    Underlying source
  2. Cancelled

    Village of DeForest declared the proposal not feasible; QTS withdrew all applications after the Village Board signaled a 7-0 rejection of annexation. WI DOA separately found the annexation not in the public interest.

    Underlying source

Source notes

Cancelled: QTS withdrew Jan 28-29 2026 after DeForest found the proposal not feasible and the Village Board signaled a 7-0 rejection of the required annexation; WI DOA found the 1,572.5-acre annexation petition not in the public interest. Active footprint was 650 acres (five buildings). Capacity omitted: no source discloses facility IT load; the 750 MW figure was a grid renewable-energy-credit commitment via Alliant, not the campus draw. Investment omitted: the $12B figure is secondary press only (QTS said 'multibillion-dollar') and unrealized. Projected 5,000+ construction and 'hundreds' of permanent jobs were never realized (project cancelled). The $50M community commitment was a QTS-to-county pledge, not a government subsidy. Coordinates are the DeForest centroid.

Alliant Energy confirmed as utility. QTS proposed enabling ~750 MW of new renewables on Alliant's grid via RECs - a grid-level commitment, not the facility's power draw. Facility IT load never disclosed.

Sources and provenance