QTS Miami (MIA1)
QTS Data Centers · Sweetwater, FL · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 11234 NW 20th St
- Coordinates
- 25.7915329, -80.3795596
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 2 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-20
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
1-acre / ~37,000-38,000 sq ft legacy colocation facility positioned around South American/Caribbean connectivity. Address (11234 NW 20th St) is commonly listed as "Miami" per USPS mailing-city convention, but independently resolves to Sweetwater city, Miami-Dade County via both the US Census Bureau Geocoder and OpenStreetMap Nominatim (same building/parcel, ~90m agreement) -- corrected here per dataset precedent (cf. Iron Mountain MIA-1, tracked under city Westview as of August 2026). DC OIX-2 certified per a March 2022 QTS press release. As of August 2026, no AI/HPC/GPU-specific marketing was found; owned by Blackstone (Infrastructure Partners + BREIT) since the 2021 QTS acquisition.
Sources and provenance
- QTS Miami (MIA1) facility page · source retrieved 2026-10-20
- QTS Miami Data Center listing · source retrieved 2026-08-02
- QTS Miami MIA1 profile · source retrieved 2026-08-02
- QTS Announces Open Internet Exchange (OIX) Data Center Certifications · source retrieved 2026-08-02
- Blackstone to Acquire QTS in Blockbuster Data Center M&A Deal · source retrieved 2026-08-02
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.