Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
45.823, -108.7
Serving utility, source-reported
NorthWestern Energy
Operational capacity, source-reported
Not published
Planned capacity, source-reported
1000 MW
Source record updated
2026-10-26

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Big Sky Digital Infrastructure (BSDI) announced by EnCap-backed Quantica Infrastructure; 5,000-acre Yellowstone County campus north of Billings

    Underlying source
  2. Proposed

    Quantica filed interconnection applications with NorthWestern Energy for 1,100 MW at Big Sky Campus

    Underlying source

Source notes

5,100-acre site in Yellowstone County between Broadview and Billings ('north of Billings'). Shovel-ready powered land; grid power expected 2027. Interconnection application filed May 2026 for 1,100 MW. Backed by EnCap Investments (~$2.7B under management). Construction planned to begin 2026. Coordinates approximate between Billings and Broadview.

Phase 1: 500 MW renewable + battery storage by 2030. Phase 2: additional 500 MW by 2031. 40,000 acres under lease for solar, wind, battery development. Grid power from NorthWestern Energy.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.