RadiusDC Plainfield Campus (Indy I / Indy II)
RadiusDC · Plainfield, IN · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 9323 AllPoints Parkway
- Coordinates
- 39.7416036, -86.35343
- Serving utility, source-reported
- Duke Energy Indiana
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 24 MW
- Source record updated
- 2026-09-13
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Operator markets a developing purpose-built colocation campus; public trackers list the campus as planned.
Underlying source
Source notes
Two buildings marketed as Indy I and Indy II, roughly 100,000 sq ft and 12 MW each (200,000 sq ft / 24 MW total), concurrently maintainable N+1, up to 400 W/sq ft, 24 hours of on-site fuel. Status is recorded as proposed because, as of September 2026, both trackers consulted list the campus as planned while the operator page markets in-service data-hall specifications; the two are in tension and a permit-level source would be needed to resolve it.
Sources and provenance
- Indianapolis Data Center | RadiusDC Location · source retrieved 2026-09-13
- Indiana Data Center Map (RadiusDC Plainfield Campus, 24 MW, planned) · source retrieved 2026-09-13
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.