Ranalli Lysander Data Center
Ranalli · Lysander, NY · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 43.17, -76.39
- Serving utility, source-reported
- National Grid
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 300 MW
- Source record updated
- 2026-10-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Early-stage hyperscale data center proposal on ~120 acres in Lysander, Onondaga County; interconnection request up to 300 MW
Underlying source
Source notes
Early-stage proposal on ~120 acres in Lysander, Onondaga County, with a grid interconnection request of up to 300 MW. Very early stage, known mainly through a grid interconnection request and local news coverage, so the record is marked rumored. Coordinates are the Lysander area centroid. No status change — the status moved away from advancing, not toward it. Lysander adopted a six-month data-center moratorium on 2026-05-07 after organised opposition, so the project remains proposed with no local approval. Community reception is documented as opposition ('Citizens Against Lysander Data Center'). Note the acreage differs between sources (124 acres in the Eagle News piece, 120 in Rockefeller) — not resolved, and a land area is recorded.
Ranalli Super DC, LLC filed a NYISO grid-interconnection request in May 2025 for 300 MW; no on-site generation is described in the sources.
Sources and provenance
- Ranalli Lysander Data Center · source retrieved 2026-07-07
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Yahoo News · source retrieved 2026-07-26
- Possible massive data center in Lysander faces community opposition, town attorney to draft moratorium · source retrieved 2026-09-09
- Updates on the Cloud: More Moratoriums on Data Centers · source retrieved 2026-10-26
- Onondaga County launches $500K study to guide towns on AI data centers · source retrieved 2026-09-14