SOURCE-LINKED U.S. REGISTRY

Project Splice (Cordele Technology Campus)

Red Wolf DCD Properties LLC (developer; end user undisclosed) · Cordele, GA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
31.9635, -83.7824
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    DRI filed; phases planned 2029, 2031 and 2033

    Underlying source

Source notes

Seven 300,000 sq ft buildings (2.1M sq ft total) with a dedicated substation, off Old Nesbitt Road just outside Cordele, Crisp County. Valued at $6B in the DRI filing, phased 2029–2033. MW is undisclosed. One tracker names Premier Data Center Development instead of Red Wolf; the name used here is the DRI applicant cited by Baxtel. Coordinates are the Cordele city centroid.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory