Project Splice (Cordele Technology Campus)
Red Wolf DCD Properties LLC (developer; end user undisclosed) · Cordele, GA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 31.9635, -83.7824
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
DRI filed; phases planned 2029, 2031 and 2033
Underlying source
Source notes
Seven 300,000 sq ft buildings (2.1M sq ft total) with a dedicated substation, off Old Nesbitt Road just outside Cordele, Crisp County. Valued at $6B in the DRI filing, phased 2029–2033. MW is undisclosed. One tracker names Premier Data Center Development instead of Red Wolf; the name used here is the DRI applicant cited by Baxtel. Coordinates are the Cordele city centroid.
Sources and provenance
- Red Wolf DCD: Project Splice (Baxtel) · source retrieved 2026-10-14
- Every Data Center in Georgia: Operating, Under Construction, and Proposed · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.