Rowan Digital Infrastructure Bauxite III

Rowan Digital Infrastructure · Frederick, MD · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.338, -77.506
Serving utility, source-reported
Potomac Edison (FirstEnergy)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-10

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Permitted

    Frederick County Planning Commission approved the Bauxite III site plan with one commissioner abstaining over soil management concerns; the parcel sits within a soil management area requiring environmental oversight.

    Underlying source

Source notes

Third phase of Rowan's Bauxite campus: three data center buildings plus an auxiliary water building, guard booth and water storage on 55 acres. Rowan states delivery in 2027. Per-phase MW omitted because published figures conflict. Re-checked 2026-09-10: status confirmed PERMITTED, no change. Same source re-fetched; per-phase MW still not stated for Bauxite III individually.

Served initially from the FirstEnergy Sage Substation.