Rowan Digital Infrastructure Frederick Campus (Bauxite I)

Rowan Digital Infrastructure · Adamstown, MD · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.265, -77.394
Serving utility, source-reported
Potomac Edison (FirstEnergy)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
300 MW
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Rowan announced three-campus development plan at Quantum Frederick; designed as AWS Maryland availability zone host

    Underlying source
  2. Under construction

    Ground broken 2024 on Bauxite I (300MW, Phase 1). Phase 2 financing: $1.24B closed February 2025, led by SMBC and MUFG; $2.2B total secured. AWS Maryland availability zone expected 2026.

    Underlying source
  3. Operational

    Rowan Digital Infrastructure's own CEO blog post confirms Bauxite I at the Frederick campus was energized and turned over to its first tenant, delivering 200+MW — the campus's first phase coming online.

    Underlying source

Source notes

Rowan (Quinbrook Infrastructure Partners + Birch Infrastructure JV) serves as AWS hyperscale host at Quantum Frederick. Three campuses planned on-site total; Bauxite I is Phase 1 at 300MW. 777,150 sq ft total campus footprint. Coordinates approximate for same Quantum Frederick campus area as the Aligned Data Centers record there (as of August 2026). The city is given as Adamstown per the more recent, project-specific Frederick News-Post coverage (2025-11-11, via Yahoo Finance); the 2021 Maryland Dept. of Commerce announcement had said "near Buckeystown". AWS is the confirmed tenant of Bauxite I on this former Alcoa Eastalco Works site — AWS's first Maryland data center. The record is listed as under construction. Rowan's CEO message of December 23, 2025 says the company "successfully energized and turned over" Bauxite I; Nature Forward's overview of the park, published June 26, 2026, states "As of June 2026, none of Quantum Frederick data centers are yet operational".

Served from the regional grid; the Maryland PSC approved Potomac Edison's plan to loop two existing 230 kV lines from the Doubs substation into a new switching station feeding the on-site Bauxite substation (built by Potomac Edison). County filings describe up to 92 x 2.75 MW backup generators (~253 MW, diesel or HVO).

Sources and provenance