SOURCE-LINKED U.S. REGISTRY

Rowan Meriwether Data Center Campus (Project Meriwether)

Rowan Digital Infrastructure · Forest Grove, OR · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
2506 Oak St
Coordinates
45.5259537, -123.0879889
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
150 MW
Source record updated
2026-10-12

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Listed as a future facility in the planning stage.

    Underlying source

Source notes

Baxtel reports that preliminary plans for Project Meriwether call for 150 MW and lists the site as 'Future facility in planning stage' at 2506 Oak St, Forest Grove, about 0.78 miles from Crane's Forest Grove campus. This is a different operator from Crane PDX01/PDX02. As of October 2026, no local permit filing was located. The coordinates are a point on Oak Street from OSM, not the parcel.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory