Rowan Project Temple
Rowan Digital Infrastructure · Temple, TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Bob White Road
- Coordinates
- 31.0982, -97.3428
- Serving utility, source-reported
- Oncor
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 300 MW
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Rowan Digital began construction on a 300 MW data center in Temple, Bell County; operations targeted 2027
Underlying source
Source notes
300 MW campus in Temple, Bell County; operations targeted 2027. Distinct from Rowan's Frederick, MD campus, tracked separately as of July 2026. Coordinates are the Temple area centroid. Rowan's January 5, 2026 announcement states a minimum $700M investment and projects approximately 600 construction jobs and more than 40 permanent positions.
Power secured via a partnership with Oncor (ERCOT grid); no on-site generation documented.
Sources and provenance
- Rowan powers Texas growth as construction begins on 300 MW Temple data center · source retrieved 2026-07-07
- City of Temple - Data Center Development FAQ (closed-loop cooling, 4,000 gpd cap) · source retrieved 2026-07-08
- Third Rowan data center; minimum $700 million investment; Temple withholds utility records · source retrieved 2026-07-08
- Temple residents raise concerns over proposed Rowan data center expansion · source retrieved 2026-07-08
- Temple — 300 MW Hyperscale Data Center Campus (operator portfolio page) · source retrieved 2026-09-08
- Rowan Digital Infrastructure seeks approval for 6th and final data center in Temple · source retrieved 2026-09-08
- Rowan Powers Texas Growth as Construction Begins on 300 MW Temple Data Center · source retrieved 2026-10-14
- Rowan portfolio: Temple, Texas (300 MW, minimum $700M investment, 700 acres) · source retrieved 2026-10-14
- New $700 million data center in Temple will be near Robinson Family Farm · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.