SOURCE-LINKED U.S. REGISTRY

Sabey Intergate.Quincy Campus

Sabey Data Centers · Quincy, WA · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
2200 M Street NE
Coordinates
47.247, -119.83
Serving utility, source-reported
Grant County PUD
Operational capacity, source-reported
70 MW
Planned capacity, source-reported
Not published
Source record updated
2026-09-05

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Cascade PBS toured Sabey's fifth and newest building on the Quincy campus, 15 years after the company first arrived; four more data halls are planned once electricity capacity catches up.

    Underlying source

Source notes

Sabey's Quincy campus (SDC Quincy / Intergate.Quincy), launched in 2011 at 2200 M Street NE, now spans more than 525,000 sq ft across five purpose-built buildings (A, B, D, E and one more). This is a distinct campus from Sabey's Intergate.Columbia in East Wenatchee (4405 Grant Road) already tracked, and from the Intergate.East and Intergate.West campuses in the Seattle area. Coordinates are an approximate geocode of the campus address.

Cascade PBS reports the entire campus is capped at 70 MW — the maximum it can draw at one time from the local utility. Sabey markets low power rates and proximity to the regional grid as siting drivers.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory