- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Wanapa Road
- Coordinates
- 45.919, -119.339
- Serving utility, source-reported
- PacifiCorp
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 150 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Sabey Data Centers announced 60-acre land purchase in Umatilla; groundbreaking planned for 2024 (revised from Q1 2025 per DCD)
Underlying source - Under construction
Construction underway on the 714,540 sq ft, 150+ MW SDC Umatilla campus (Wanapa Road): work has been ongoing at the site since spring 2026 (rock excavation and blasting). The first of two data halls is targeted to go online April 2028.
Underlying source
Source notes
Two-building, 714,540 sq ft multi-tenant campus. Groundbreaking originally Q1 2025, revised to 2024 per DCD; in July 2026 Sabey's assistant general manager for the Umatilla campus told the Hermiston Herald that work had been going on at the site since spring. Investment figures conflicting across sources ($520M in one report, ~$950M in another); no investment figure is recorded. Coordinates are Umatilla city centroid. Planned capacity revised from 100 MW to 150 MW: the campus is described as designed to support more than 150 megawatts. Sabey's own materials give a more conservative "120 MW+", which is consistent rather than contradictory.
Oregon grid is 40% renewable with 100% target by 2040. Sabey committed to net-zero carbon-free energy by 2029, 11 years ahead of Oregon's state target. JetCool Technologies liquid cooling pilot testing underway.
Sources and provenance
- Sabey Data Centers Purchases 60 Acres in Umatilla, Oregon for 100MW+ Facility · source retrieved 2026-07-06
- Sabey Data Centers to Build New Data Center Campus in Umatilla, Oregon · source retrieved 2026-07-06
- Sabey Data Centers comes to Umatilla · source retrieved 2026-07-06
- Sabey Data Centers picks Oregon · source retrieved 2026-07-06
- 714,000-square-foot data center construction under way in Umatilla · source retrieved 2026-07-18
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- 714,000-square-foot data center construction under way in Umatilla · source retrieved 2026-09-05
- SDC Umatilla · source retrieved 2026-09-05
- Sabey Data Centers breaks ground on 714,540-square-foot Umatilla campus · source retrieved 2026-10-12
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.