Sagebrush Hallam Hyperscale Campus (proposed)
Sagebrush Infrastructure Partners · Hallam, NE · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.545, -96.7992
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1700 MW
- Source record updated
- 2026-09-16
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Land options across 1,400+ acres in southwestern Lancaster County reported; no application filed.
Underlying source
Source notes
Land assemblage only — memorandums of purchase agreement with 13 landowners along Southwest 58th Street just west of Hallam, giving exclusivity windows of roughly six months to four years. Sagebrush Infrastructure Partners LLC was acquired by Tel Aviv-based Stark Power in June 2026 as part of a reported 5.6 GW US development pipeline; the Hallam site is one of five planned hyperscale campuses targeting MISO and SPP territory. Coordinates are an approximation of the reported SW 58th Street assemblage west of Hallam; no parcel map has been published. Distinct from the separate 35 MW Monolith/Crusoe proposal inside the Village of Hallam's zoning jurisdiction.
Sagebrush is described as a developer of hyperscale data centers with co-located natural gas-fired power plants. Reporting says the developer wants natural gas, water, and a grid interconnection as a redundant source: "They're going to provide their own power, but they also want to hook up to the grid in case their power goes down." The optioned land sits near NPPD's Sheldon Station and its Princeton Road Station site.
Sources and provenance
- Data center developers eyeing land near Hallam · source retrieved 2026-09-16
- Hallam landowners face stark choice on data center · source retrieved 2026-09-04
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.