- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 2600 De La Cruz Boulevard
- Coordinates
- 37.379478, -121.939528
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
CEC granted a Small Power Plant Exemption for the 96.5 MW Sequoia Backup Generating Facility (54 diesel generators) supporting a four-story ~702,114 sq ft data center on a 15-acre site; Santa Clara approved the project in 2021.
Underlying source - Permitted
CyrusOne sold the entitled 15.2-acre site (and an adjacent 8.4-acre parcel at 2750 De La Cruz) to a Tishman Speyer affiliate for $65.4M; whether Tishman Speyer will submit a revised proposal is not yet known.
Underlying source
Source notes
Pre-construction code name 'Sequoia' (CyrusOne via CI-Santa Clara LLC). Entitlement: ~703,000 sq ft, 96.5 MW backup generation. Land traded to Tishman Speyer in July 2026 ($42.4M for 2600 De La Cruz, $23M for 2750 De La Cruz); current development plan unconfirmed, hence the record is marked reported.
Sources and provenance
- California Energy Commission — Sequoia Data Center (19-SPPE-03), Small Power Plant Exemption · source retrieved 2026-09-21
- Tishman Speyer grabs Santa Clara land entitled for data center for $65M (2026-07-29) · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.