Serverfarm LAX1
Serverfarm · El Segundo, CA · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 444 North Nash Street
- Coordinates
- 33.9217807, -118.3864589
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 17.3 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-19
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Formerly T5 Data Centers (T5@LA), built 2011 (~$30M construction cost); sold to Serverfarm + NantWorks for $71M in April 2021 and rebranded LAX1. Capacity corrected: Serverfarm's own current site discloses 17.3MW IT capacity / 26MVA utility capacity (not the 22MW figure some discovery leads cite, which conflates the 2021 acquisition press release's '22 MVA' apparent-power figure with real MW); datacenterHawk independently corroborates ~18.3MW commissioned. The AI classification is set to likely on the strength of facility-specific 'AI-ready... liquid cooling... 200 W/sq ft' language on Serverfarm's current site, though no named AI/HPC tenant was confirmed. Distinct from an unrelated, separate 2026 community-opposition story at 750 North Nash Street (a different, proposed, since-withdrawn project) - no opposition attaches to this facility.
Sources and provenance
- Serverfarm Los Angeles (LAX1) data center page · source retrieved 2026-10-19
- Serverfarm acquires Los Angeles data center (press release) · source retrieved 2026-08-02
- 117,000 SF data center trades in El Segundo, CA · source retrieved 2026-08-02
- Serverfarm strikes $71M El Segundo HQ deal · source retrieved 2026-08-02
- T5 Data Expansion Project (EA 971), 444 North Nash Street - CEQA filing · source retrieved 2026-08-02
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.