Nebo North Data Center Campus (Project Nebo)
SetSquare Capital Group (Nebo North LLC) · Mona, UT · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.8605, -111.909
- Serving utility, source-reported
- Rocky Mountain Power
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 750 MW
- Source record updated
- 2026-10-13
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Juab County posts a public hearing notice for the Nebo North LLC conditional use permit application for a data center campus
Underlying source - Permitted
Juab County Planning Commission approves the conditional use permit after a roughly four-minute hearing
Underlying source
Source notes
Up to 10 single-story buildings of about 300,000 sq ft each (about 3M sq ft) on about 361 acres of agricultural land off Goshen Road, near the town of Mona. The CUP covers Sections 13 and 14, T11S R1W. The coordinates are approximated from those PLSS sections and are not parcel-confirmed. SetSquare co-founder Jonathan Vanica is quoted by Deseret News.
Developers are seeking up to 750 MW from Rocky Mountain Power's grid through a Mona transmission line. The permit application says on-site natural gas generation could also be used, and Deseret News reports that a gas-powered plant is planned.
Sources and provenance
- A Utah county OK'd a data center campus the size of 20 Costcos. Neighbors say they were left 'in the dark.' · source retrieved 2026-10-13
- Notice of Public Hearing: Nebo North LLC Conditional Use Permit · source retrieved 2026-10-13
- Mona citizens revolt against local data centers · source retrieved 2026-10-13
- Mona residents against data center · source retrieved 2026-10-13
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.