Project Kestrel
Shenandoah Computing LLC · Kansas City, MO · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Southwest corner of Missouri Highway 92 and N. Winan Avenue (KCI 29 Logistics Park)
- Coordinates
- 39.3470623, -94.7038818
- Serving utility, source-reported
- Evergy
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-13
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Six hyperscale data center buildings planned (up to 1.8M sq ft total) on ~379-430 acres within Hunt Midwest KCI 29 Logistics Park, Platte County. Distinct from Google Project Mica, a separate campus ~9km east in Clay County. Operator attribution, checked 2026-09-10: the consulted sources name the developer only as Shenandoah Computing LLC. KSHB names Shenandoah as the applicant and mentions Google solely in a context sentence about campuses already under construction in the Northland; Port KC does not mention Shenandoah at all. No consulted source ties Shenandoah to Google or any named hyperscaler, so no end-tenant is recorded here. An aggregator listing attributes this to Google; this dataset has previously found that aggregator wrong about an operator, so it is not relied on. Investment, checked 2026-09-10: the $100B figure is the ceiling of a conduit bond series Shenandoah asked Port KC to authorize (KSHB: "a series of conduit bonds that could reach $100 billion"), not a stated project investment, so no investment figure is recorded. Port KC approved a Chapter 100-style industrial development plan on 2025-08-28 with a 35-year real/personal property tax exemption and sales-tax relief on construction materials; no single abatement dollar total was stated, only projected net new tax revenue of ~$110M across all phases, so no subsidy is recorded. Local press (fox4kc, 2025-11) reports Platte County’s presiding commissioner publicly opposed the tax-break package; as of September 2026, that page could not be read and archive.org was rate-limiting at retrieval, so this is an unverified lead, not a sourced community finding. Phase 1 was slated to begin 2026; not confirmed started.
Project commits to a minimum of 50% of all energy from carbon-free resources; development includes an on-site power substation.
Sources and provenance
- Tech firm eyes development for 6 data centers north of Kansas City International Airport · source retrieved 2026-09-10
- $100 Billion Data Center Development to bring Infrastructure, Investment and Jobs to the Northland · source retrieved 2026-09-10
- Project Kestrel Data Center · source retrieved 2026-09-10
- KCI 29 Logistics Park (OpenStreetMap) · source retrieved 2026-09-10
- Platte County commissioner can't support $100 billion Northland data center · source retrieved 2026-10-13