Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry)
Silicon Foundation Energy · Wheeling, WV · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 74 Warwood Avenue
- Coordinates
- 40.1013314, -80.7029667
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 100 MW
- Source record updated
- 2026-10-29
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Silicon Foundation purchased the ~15-acre former Centre Foundry property at 74 Warwood Avenue and announced a phased data center and energy campus.
Underlying source
Source notes
Phased plan: Phase 1 a 10-MW modular data center system with battery energy storage targeted for late 2026; Phase 2 expansion to 20–30 MW (reported as "as much as 100 megawatts" in 2027 by River News); Phase 3 a 100-MW regional compute hub. The planned capacity records the 100-MW full build-out. The foundry operated for more than 180 years until it closed in 2023. Under HB 2014 the project is exempt from county/municipal zoning and building permitting. Coordinates are the OSM address point for 74 Warwood Avenue, not a parcel-confirmed footprint.
Phase 1 is described as 10 MW drawn from the existing grid through the site's existing electrical substation, paired with battery energy storage; the development plan also cites on-site gas infrastructure for backup power. Stokes Energy is named as the EPC contractor.
Sources and provenance
- State's Sixth Data Center Announced Near Wheeling · source retrieved 2026-10-28
- Historic Centre Foundry Site Sold, Plans Announced for Data Center and Energy Campus in Wheeling · source retrieved 2026-09-15
- OpenStreetMap Nominatim geocode — 74 Warwood Avenue, Wheeling, Ohio County, WV 26003 · source retrieved 2026-09-15
- 100MW Data Center Proposed for Wheeling, West Virginia · source retrieved 2026-10-28
- Warwood residents file civil suit to stop data center development · source retrieved 2026-10-29
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.