Site Layer 4 Goshen Hole Data Center Campus
Site Layer 4, LLC · Wheatland, WY · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 42.1, -104.71
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-17
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
Platte County Commission unanimously approved industrial rezoning of 5,344 acres with conditions, including reversion to prior zoning if construction does not begin within five years, a required special-use permit, and county review of the industrial park plan. Reported by Cowboy State Daily on 2026-09-02; the exact vote date is not restated here because the source's own dating is ambiguous.
Underlying source
Source notes
Site is on the Lazy V Six Ranch in Goshen Hole, northeast of Wheatland near the Platte-Goshen county line and roughly 13 miles east of Interstate 25. Permanent jobs were reported as a 250-300 range; the low end is recorded here. No megawatt figure has been published. Coordinates are a geocode from that published description and are not a parcel-confirmed point.
Developer describes a self-generating campus with co-located utility-scale generation and says it would not draw on municipal water or the Wheatland Irrigation District. Fuel type for the co-located generation was not specified in the county proceedings as reported.
Sources and provenance
- Ranchlands Near Wheatland Eyed For $26 Billion 'Transformational' Data Center · source retrieved 2026-10-17
- Platte County Commissioners Push Back, Then OK Industrial Zoning For Data Center · source retrieved 2026-10-17
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.