Solis Arx Progress Park Data Center Campus
Solis Arx · Max Meadows, VA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 36.958, -80.899
- Serving utility, source-reported
- Appalachian Power
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Wythe County and Solis Arx announced a data center / 'AI factory' campus on a 99-acre lot in Progress Park; Wythe County has no zoning, so no rezoning is required.
Underlying source
Source notes
Solis Arx (owner-operator; AI-compute tenant reported as Fluidstack) plans a phased AI data center campus on a 99-acre tract in Wythe County's Progress Park, ~15 minutes from Wytheville, served by Appalachian Power and Wytheville water. Coordinates are an approximate geocode of Progress Park (Max Meadows / Fort Chiswell area off I-81), not a parcel-confirmed point.
Sources and provenance
- Data center campus announced for Wythe County · source retrieved 2026-07-26
- Solis Arx Digital Infrastructure Project at Progress Park · source retrieved 2026-07-26
- Wythe County and Solis Arx Announce New Digital Infrastructure Investment in Progress Park · source retrieved 2026-07-26
- AI computing center headed to Wythe County · source retrieved 2026-07-26
- County explains Solis Arx data center plans as residents voice concerns · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.