Soluna Project Ellen
Soluna Holdings · Rio Hondo, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 26.2373, -97.5814
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 100 MW
- Source record updated
- 2026-08-03
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Term sheet for power signed April 2025; PPA, land, and ERCOT interconnection agreements still in progress per baxtel (year planned 2026).
Underlying source
Source notes
Co-located with the 145 MW Palmas Wind (Palmas Altas) wind farm near Rio Hondo, Cameron County (independently verified at 144.9 MW nameplate via GridInfo); built in two 50 MW phases.
Sources and provenance
- Soluna to Expand Renewable-Powered AI & Bitcoin Computing With New 100MW Site · source retrieved 2026-08-03
- Soluna: Project Ellen Data Center · source retrieved 2026-08-03
- Palmas Wind, LLC plant record · source retrieved 2026-08-03
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.