SOURCE-LINKED U.S. REGISTRY

Soluna Project Fei

Soluna Holdings · Childress, TX · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
34.4262, -100.2013
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
100 MW
Source record updated
2026-08-03

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Announced Aug 26 2025 as part of Soluna's '1 GW milestone'; still in land acquisition, power contract negotiation, and ERCOT interconnection planning per Soluna. Baxtel lists year planned 2028.

    Underlying source

Source notes

Co-located with a 240 MW utility-scale solar farm; named for AI researcher Fei-Fei Li.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory