Soluna Project Fei
Soluna Holdings · Childress, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 34.4262, -100.2013
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 100 MW
- Source record updated
- 2026-08-03
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Announced Aug 26 2025 as part of Soluna's '1 GW milestone'; still in land acquisition, power contract negotiation, and ERCOT interconnection planning per Soluna. Baxtel lists year planned 2028.
Underlying source
Source notes
Co-located with a 240 MW utility-scale solar farm; named for AI researcher Fei-Fei Li.
Sources and provenance
- Soluna Surpasses One Gigawatt of Clean Computing Projects with Launch of Two New Sites · source retrieved 2026-08-03
- Soluna Project Fei Data Center Details · source retrieved 2026-08-03
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.