Soluna Project Grace
Soluna Holdings · Silverton, TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 34.4692, -101.3082
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 2 MW
- Source record updated
- 2026-08-03
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Siemens MOU announced Jan 8 2026 for a 2 MW behind-the-meter power-and-controls pilot to validate managing rapid GPU-driven power swings for AI/HPC workloads at the Project Grace site. Soluna's own project tracker lists Grace as 'Under Construction.'
Underlying source
Source notes
Wind-powered pilot near Soluna's existing Dorothy 1A/1B/2 sites in Silverton (~3.7 miles away, per Baxtel — a distinct physical site). Siemens partnership will supply electrical/mechanical equipment (transformers, switchgear, power converters) to test behind-the-meter AI/HPC power management. Named for Grace Hopper.
Sources and provenance
- Soluna and Siemens Collaborate to Solve GPU Power Swings in Behind-the-Meter AI · source retrieved 2026-08-03
- Soluna: Project Grace Data Center · source retrieved 2026-08-03
- Data Centers — Soluna Computing (project tracker) · source retrieved 2026-08-03
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.