SOURCE-LINKED U.S. REGISTRY

Soluna Project Grace

Soluna Holdings · Silverton, TX · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
34.4692, -101.3082
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
2 MW
Source record updated
2026-08-03

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Siemens MOU announced Jan 8 2026 for a 2 MW behind-the-meter power-and-controls pilot to validate managing rapid GPU-driven power swings for AI/HPC workloads at the Project Grace site. Soluna's own project tracker lists Grace as 'Under Construction.'

    Underlying source

Source notes

Wind-powered pilot near Soluna's existing Dorothy 1A/1B/2 sites in Silverton (~3.7 miles away, per Baxtel — a distinct physical site). Siemens partnership will supply electrical/mechanical equipment (transformers, switchgear, power converters) to test behind-the-meter AI/HPC power management. Named for Grace Hopper.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory