STACK Trade Zone Park (SVYDC 05 / SVYDC 06)
STACK Infrastructure · San Jose, CA · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 2400 Ringwood Avenue
- Coordinates
- 37.4028987, -121.8950398
- Serving utility, source-reported
- Pacific Gas and Electric Company
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 90 MW
- Source record updated
- 2026-10-19
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
CEC granted the small power plant exemption following certification of the Final EIR on 2023-03-30.
Underlying source
Source notes
At the corner of Trade Zone Boulevard and Ringwood Avenue (2400 Ringwood Avenue and 1849 Fortune Drive), San Jose — distinct from the tracked STACK Silicon Valley (SVY01/SVY02) and Hayward (SVY03A) sites. The City of San José approved-project list (PD22-001) gives the site as approximately 9.78 gross acres.
CEC Small Power Plant Exemption 21-SPPE-02: 39 diesel-fired generators (36 rated 3 MW and 3 rated 1 MW) arranged in two generation yards, each serving one of the two data center buildings.
Sources and provenance
- STACK Trade Zone Park (21-SPPE-02) · source retrieved 2026-09-14
- Nominatim geocode of 2400 Ringwood Avenue, San Jose, CA · source retrieved 2026-09-14
- CPUC Resolution E-5447: PG&E EPC agreement (AL 7653-E) supporting energization of STACK Infrastructure's new 90 MW data center load in San Jose · source retrieved 2026-09-21
- City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13) · source retrieved 2026-10-19
- CPUC Resolution E-5447 – PG&E EPC Agreement with STACK Infrastructure (Ringwood Switching Station) · source retrieved 2026-10-19