Stak Energy North Slope Data Center
Stak Energy · , AK · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 69.84, -148.5
- Serving utility, source-reported
- Tdx North Slope Generating Co
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 3000 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Alaska DNR issued preliminary best-interest finding supporting long-term state land lease for 715.4 acres; public review process initiated
Underlying source
Source notes
Preliminary state land lease approval covers 715.4 acres (corrected from 640; one square mile = 640 acres exactly but the approved lease footprint is 715.4 acres per Alaska Beacon). Campus is approximately 26 miles south of Deadhorse/Prudhoe Bay off the Dalton Highway (corrected from 25 miles). Supports AI training, cloud computing, and HPC. 3 GW is the project's claimed ultimate potential; $500M is Phase 1 capital. Coordinates estimated (~26 miles south of Prudhoe Bay 70.2N/148.5W); exact site not publicly disclosed.
New pipeline to carry North Slope natural gas to on-site power plant. Self-contained, not connected to Alaska's statewide electrical grid.
Sources and provenance
- Alaska's North Slope Proposed as Home for Massive AI Data Center · source retrieved 2026-07-06
- A Huge Data Center Could Rise on Alaska's North Slope · source retrieved 2026-07-06
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- STAK Energy Corporation ADL 422741 Preliminary Decision (Director's Decision, May 12, 2026) · source retrieved 2026-09-28
- Data center in play · source retrieved 2026-10-18
- STAK Energy Campus: What the State's Lease Documents Reveal About Scale, Risk, and Unanswered Questions · source retrieved 2026-10-18
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.