SOURCE-LINKED U.S. REGISTRY

Stargate Lighthouse Campus

Vantage Data Centers · Port Washington, WI · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Between I-43, Dixie Road, and the Ozaukee Interurban Trail, north of the city of Port Washington
Coordinates
43.3882, -87.8753
Serving utility, source-reported
We Energies (WEC Energy Group)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
902 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Announced as Stargate Wisconsin site; $15B, 4-building campus on 674 acres north of Milwaukee

    Underlying source
  2. Under construction

    Ground broken; foundation work visible in satellite imagery; Phase 1 ($8B) targeted 2028

    Underlying source

Source notes

The planned 902 MW is the campus's IT capacity, per Data Center Knowledge (December 2025).

Vantage commits to '100% Matched Zero-Emission Energy' via solar, wind, and battery storage; the four buildings need ~1.3 GW, served under a dedicated We Energies rate with Vantage underwriting the power infrastructure. A $1.4B transmission line was proposed by American Transmission Co.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory