Stargate The Barn Campus
OpenAI / Oracle / Related Digital · Saline Township, MI · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 42.174, -83.8063
- Serving utility, source-reported
- DTE Energy
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1400 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
$16B campus on 250 acres SW of Ann Arbor; township initially voted against rezoning; resolved via lawsuit settlement
Underlying source - Under construction
Official groundbreaking with Gov. Whitmer; 3 buildings of 550,000 sq ft each; Oracle, OpenAI, Related Digital; first steel beams installed March 2026
Underlying source
Source notes
The Michigan Data Center Tracker (baldorilaw.com, retrieved 2026-09-09) lists 'The Barn' campus in Saline Township as 'Under construction · 2026-04'. No site-specific incentive award has been found: Michigan's 2024 data-center sales and use tax exemptions may apply, but no source ties an award to this site, and the MPSC conditions are ratepayer protections, not subsidies.
DTE Energy supplies 100% of power using existing resources augmented by a new battery-storage investment financed entirely by the project, so as not to affect other DTE customers' supply or rates (per Related Digital and MPSC review).
Sources and provenance
- Oracle and OpenAI start construction on Stargate campus in Saline Township, Michigan — Data Center Dynamics · source retrieved 2026-07-05
- Stargate updates: OpenAI, Oracle building Michigan data center — CNBC · source retrieved 2026-07-05
- OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan · source retrieved 2026-07-06
- OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan (PR Newswire) · source retrieved 2026-07-06
- A Michigan farm town voted down a giant OpenAI-Oracle data center. Weeks later, construction began · source retrieved 2026-07-06
- OpenAI, Oracle and Related Digital announce Stargate data center site in Michigan · source retrieved 2026-09-09
- MPSC grants expedited approval for DTE contracts with hyperscale data center (Case U-21990) · source retrieved 2026-09-09
- MPSC order, Case No. U-21990 — DTE Electric primary supply agreement and energy storage agreement with Green Chile Ventures LLC (a subsidiary of Oracle Corporation) · source retrieved 2026-09-14
- Michigan Data Center Projects: 2026 Locations & Tracker (Stargate Saline: 1,383 MW contracted maximum load) · source retrieved 2026-10-24
- How data centers factor into DTE's 20-year power plan (Saline Township data center, 1.4 GW, DTE contracts approved) · source retrieved 2026-10-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.