Project Washington (Starwood Digital Ventures)
Starwood Digital Ventures · Delaware City, DE · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 825 Governor Lea Road
- Coordinates
- 39.578, -75.593
- Serving utility, source-reported
- Delmarva Power & Light
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1200 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Starwood Digital proposed 11-building, 1.2 GW hyperscale campus on 580 acres adjacent to former Delaware City Refinery land (Hamburg Road/River Road/Governor Lea Road).
Underlying source
Source notes
Largest proposed data center in Delaware history. 11 two-story buildings, 5 substations, 1 switch station, 516 emergency diesel generators on 580 acres. CZA permit denied February 4, 2026; denial unanimously upheld by Coastal Zone Industrial Control Board March 26, 2026. Appeal to Delaware Superior Court anticipated. Delaware Building Trades Council exclusive union labor agreement in place. Original $9.7B investment figure removed — not confirmed in any cited source. Coordinates approximate for Delaware City area.
Primary supply from the PJM grid via Delmarva Power & Light's Red Lion substation. The project's 516 on-site diesel generators are emergency backup, not primary generation; no on-site gas generation is proposed.
Sources and provenance
- Delaware City data center faces major setback after environmental denial · source retrieved 2026-07-06
- Starwood Digital Ventures makes its case to overturn Coastal Zone ruling against its data center plan · source retrieved 2026-07-06
- DNREC Coastal Zone Status Decision — Starwood Digital Ventures (CZA-448SD) · source retrieved 2026-07-06
- Delaware City data center environmental denial upheld by state board · source retrieved 2026-07-06
- Starwood files to develop 1.2GW, 11-building data center campus in Delaware · source retrieved 2026-07-06
- Proposed Delaware City data center could use between 10 to 20 million gallons of water a year · source retrieved 2026-07-06
- Mega Del. City data center awaits state-level approval; county officials still have concerns (Aug 19, 2025) · source retrieved 2026-10-20
- DNREC Coastal Zone Status Decision, Project Washington (Feb 3, 2026) · source retrieved 2026-10-20
- Data Centers in Delaware (Project Washington South Campus at 825 Governor Lea Road) · source retrieved 2026-10-20