Project Horizon (Tech oNE Crossing)

Starwood Digital Ventures · Kearney, NE · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
40.728341, -99.045806
Serving utility, source-reported
Nebraska Public Power District
Operational capacity, source-reported
Not published
Planned capacity, source-reported
368 MW
Source record updated
2026-10-12

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Kearney Planning Commission unanimously recommended a conditional use permit for Project Horizon at Tech oNE Crossing; applicant Worldwide Mission Critical, with Starwood Digital Ventures (SDV) partnering with MARA.

    Underlying source
  2. Permitted

    Kearney City Council unanimously approved the Project Horizon conditional use permit.

    Underlying source

Source notes

Multi-phase data center campus at Tech oNE Crossing, east of Antelope Ave. and south of Tech One Blvd/Global Drive, outside Kearney city limits. 368 MW total electrical demand at full build-out. Phase 1 reuses the 100 MW of capacity at the adjacent existing crypto-mining site, which is to be decommissioned after Phase 1; Phase 3 extends onto the former mining property. That mining site is tracked separately as the MARA Kearney Facility as of October 2026; this record is the successor AI/data-center campus, not a duplicate of it. WOWT (carrying a Flatwater Free Press report) says the city acquired roughly 112 acres for the Tech oNE tech park as a whole; as of October 2026, that report gives no acreage for the campus itself. It reports first phase completion by late 2027 and full capacity around 2030; the tenant is undisclosed under NDA. Permit conditions: development must begin within two years, plus annual hazardous-materials inventory. Coordinates are approximate, borrowed from the adjacent mining site on the same Tech oNE Crossing parcel complex.

Phase 1 reuses 100 MW of existing capacity at the site's crypto-mining operation; SDV said it would pay for any infrastructure upgrades needed for the added demand.