SOURCE-LINKED U.S. REGISTRY

Project Tamarack

Starwood Digital Ventures · West Columbia, WV · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
38.9831343, -82.0634753
Serving utility, source-reported
Appalachian Power
Operational capacity, source-reported
Not published
Planned capacity, source-reported
2160 MW
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Announced 2026-09-03 by Gov. Morrisey as a separate, distinct project from Nscale's Monarch Compute Campus (also Mason County, ~20 min drive south near Point Pleasant). Governor's office figure of 'approximately 2.16 gigawatts' converted directly to MW (2,160) -- exact stated figure, not a rounded estimate. Project details at projecttamarack.com (not independently retrieved as of September 2026).

Reported to use existing Appalachian Power grid infrastructure rather than dedicated on-site generation, unlike the nearby Nscale/Monarch project.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory