The STEM Practice Sycamore View AI Data Center
Golden Acquisitions / The STEM Practice · Memphis, TN · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- exact
- Address as listed
- 1341 Sycamore View Road
- Coordinates
- 35.161633, -89.85969
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 9 MW
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Reported 2026-01-13: 'Nate Golden of Golden Acquisitions' is purchasing the building at 1341 Sycamore View and working with The STEM Practice, described as 'a tech company that works with Oracle,' to build a modular AI data center ('will be modular instead' of a hyperscale build like xAI's Colossus). Timeline per the source: 'the plan is to have part of the data center running by May 1.' Data Center Dynamics (January 15, 2026) reports that the existing four-story building, built in 1983, is set on a 1.5-acre parcel, that the first phase of the 38,500-square-foot data center could be live by May 2026, and that the site could offer up to 9MW at full build-out; it also reports Golden saying on LinkedIn that the Memphis site is one of four Tennessee data center locations slated to open in May 2026. The 9MW full build-out figure is recorded as planned capacity and the 1.5-acre parcel as the land area. A secondary aggregator (datacentermap.com, not independently fetched as of September 2026) reports the same figures and states this is one of four planned STEM Practice sites in Tennessee. Coordinates are an OSM-mapped building way at the exact street address.
Sources and provenance
- Another AI data center coming to Memphis, sources say · source retrieved 2026-09-13
- Data center acquired in Memphis, set to serve Oracle cloud partner (DCD, Jan 15, 2026; archived copy): 1341 Sycamore View Road, 1.5-acre parcel, 38,500 sq ft, up to 9 MW at full build-out · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.