Lovejoy Data Center Campus (Stillwater Development)
Stillwater Development · Lovejoy, GA · United States
Facility record
- Lifecycle
- CancelledSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 11760 Panhandle Road
- Coordinates
- 33.4516522, -84.343564
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1250 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Stillwater Development filed plans for a 3.5 million sq ft, 15-building campus at 11760 Panhandle Road in Lovejoy.
Underlying source - Cancelled
The proposal was formally withdrawn at a Lovejoy city council meeting; the mayor indicated the developers intend to pursue residential development for the site instead.
Underlying source
Source notes
Fifteen buildings totalling 3.5 million sq ft with 1.25 GW at full build-out, reviewed through the Developments of Regional Impact process before withdrawal. Coordinates come from the geocoded Panhandle Road address and are approximate.
Sources and provenance
- Proposal for Clayton County data center withdrawn · source retrieved 2026-09-10
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.