Florida Ecopark AI Data Center Campus
Stonebridge (via Florida Ecopark LLC; end tenant undisclosed) · Fort Meade, FL · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 27.7525, -81.8024
- Serving utility, source-reported
- Duke Energy Florida
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1200 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Stonebridge/Florida Ecopark LLC proposed development on 1,300-acre former phosphate mine; data center footprint 200 acres
- Proposed
Fort Meade Planning Commission voted unanimously to recommend approval of 20-year development agreement
Underlying source - Proposed
Fort Meade City Commission approved 20-year development agreement despite near-unanimous public opposition; outstanding water use and grid interconnection permits required before construction can proceed
Underlying source - Proposed
Florida Commerce Secretary Alex Kelly called project fundamentally flawed over water, energy, and transportation risks in letter to Fort Meade
Underlying source
Source notes
1,300-acre former phosphate mine site; 200-acre data center footprint. 20-year development agreement approved by Fort Meade City Commission approximately April 15, 2026. Requires 1.2 GW of electricity. No identified lessee or buyer publicly disclosed. Water use reduced in plans from 140,000 to 50,000 gallons daily; Southwest Florida Water Management District approval pending separately. Florida SB 484 signed May 2026 added new state-level data center siting requirements. Coordinates are Fort Meade city centroid; actual site is former phosphate mine outside city limits. As of 2026-09-10, the record remains listed as proposed. The 20-year development agreement was unanimously approved by Fort Meade commissioners (2026-04-15), but two resident lawsuits filed 2026-05-14 seek to void that approval and block construction-permit issuance (trial scheduled November 2027), and a recall effort against three commissioners is itself now in litigation (Commissioner Matthew Taylor sued 2026-09-09 to stop the recall). No groundbreaking reported. An exact street address has not been found in public reporting (site described only as 'west of US-98' on former phosphate-mine land). The Florida Department of Commerce letter of April 15, 2026 describes the project as "nestled off SR-17" and within the vicinity of US 98, SR 62, and SR 64.
Expected to be powered by Duke Energy (near its Hines Energy Complex); Fort Meade residents currently receive power through the Florida Municipal Power Agency. No on-site generation reported.
Sources and provenance
- Fort Meade is one step closer to building Florida's first hyperscale AI data center · source retrieved 2026-07-06
- DeSantis admin hits Florida city over hyperscale data center proposal · source retrieved 2026-07-06
- Florida secretary of commerce raises concerns over $2.6B Fort Meade data center plan · source retrieved 2026-07-06
- Florida Data Center Plan Advances Amid Local Backlash · source retrieved 2026-07-06
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.