Switch CITADEL Campus
Switch · McCarran, NV · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 1 Superloop Circle
- Coordinates
- 39.6183, -119.3732
- Serving utility, source-reported
- NV Energy (grid interconnect)
- Operational capacity, source-reported
- 250 MW
- Planned capacity, source-reported
- 650 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under constructionUnderlying source
- Operational
Located in Tahoe Reno Industrial Center (TRIC); expanding toward 650 MW campus
Underlying source
Source notes
100% renewable since January 2016 via dedicated solar — Switch Station 1 & 2 (179 MW) and a 555 MW Nevada solar project (a reported 127 MW behind-the-meter at Citadel); Switch exited NV Energy's standard supply in 2016 ($27M exit fee). The campus is designed for up to 650 MW at about 4.9¢/kWh.
Sources and provenance
- Switch CITADEL Campus — Switch.com · source retrieved 2026-07-05
- Switch unveils 650 MW campus in Reno, Nevada — Data Center Knowledge · source retrieved 2026-07-05
- Switch TAHOE RENO Now Open — largest, most advanced data-center campus in the world · source retrieved 2026-07-06
- Have data center tax breaks helped Nevada's economy? — The Nevada Independent · source retrieved 2026-07-06
- Switch Will Support Reno Data Center Campus with Reclaimed Water — Data Center Frontier · source retrieved 2026-07-06
- Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World · source retrieved 2026-09-24
- NDEP Class I Air Quality Operating Permit to Construct AP7375-3672 issued to Switch, Ltd. - physical address 1 Superloop Circle, McCarran NV 89434, HA 83 Tracy Segment / Storey County · source retrieved 2026-09-11
- PeeringDB facility registry (Nevada) - Switch Tahoe Reno, org Switch, Ltd., 1 Superloop Circle, McCarran 89434 · source retrieved 2026-09-11
- Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.