Switch CITADEL Campus

Switch · McCarran, NV · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
1 Superloop Circle
Coordinates
39.6183, -119.3732
Serving utility, source-reported
NV Energy (grid interconnect)
Operational capacity, source-reported
250 MW
Planned capacity, source-reported
650 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Underlying source
  2. Operational

    Located in Tahoe Reno Industrial Center (TRIC); expanding toward 650 MW campus

    Underlying source

Source notes

100% renewable since January 2016 via dedicated solar — Switch Station 1 & 2 (179 MW) and a 555 MW Nevada solar project (a reported 127 MW behind-the-meter at Citadel); Switch exited NV Energy's standard supply in 2016 ($27M exit fee). The campus is designed for up to 650 MW at about 4.9¢/kWh.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.