SOURCE-LINKED U.S. REGISTRY

Switch EVO AI Factories 1 & 2 (Jones Blvd / 215 Beltway)

Switch · Las Vegas, NV · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
36.0634602, -115.2238166
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Switch-hosted Review-Journal coverage says construction is underway; Baxtel lists the buildings as under construction for 2026.

    Underlying source

Source notes

Two AI-dedicated buildings, about 199,000 and 228,000 sq ft per Clark County records, at the southwest corner of the Jones Blvd–215 Beltway interchange (listed address W Maule Ave). The pin is approximate: the W Maule Ave segment near Jones Blvd. MW are not disclosed.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory