Switch Pyramid Campus

Switch · Gaines Township, MI · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
6100 East Paris Avenue SE
Coordinates
42.823, -85.64
Serving utility, source-reported
Consumers Energy
Operational capacity, source-reported
225 MW
Planned capacity, source-reported
320 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Switch acquires 7-story Steelcase Pyramid building in Gaines Township, Kent County for $22.2M; Phase 1 delivers 225,000 sq ft white space

  2. Under construction

    Phase 2 begins: 312,000 sq ft second building

  3. Under construction

    Phase 2 completed spring 2025; Phase 3 third building announced; construction expected to start 'sooner rather than later'; investment 'several hundred million dollars'

    Underlying source

Source notes

Steelcase Pyramid campus, Gaines Township, Kent County MI (south of Grand Rapids; not the city of Wyoming, which is a separate municipality ~5 km north). Total campus target: 1.8M sq ft, 320 MW, ~$5B investment across all phases. Phase 1 (225,000 sq ft white space) and Phase 2 (312,000 sq ft) operational; Phase 3 in planning/early construction as of 2025. Michigan's largest data center by capacity. Coordinates are approximate Pyramid campus location on East Paris Ave, Gaines Township. The campus itself has been open and serving customers since 2017, with buildings added incrementally. Data Center Dynamics reported in November 2024 that Switch was close to completing the second building and planning a third, with construction expected to start "sooner rather than later"; as of October 2026, none of the cited sources shows the third building under construction. As of September 2026, no cooling or water source could be retrieved; switch.com/pyramid renders its specs via JavaScript and returned only a headline.

100% renewable — Switch was Consumers Energy's first large-business renewable customer and negotiated a dedicated new wind project; an on-site substation provides grid interconnection (not generation). The campus is designed for up to 320 MW.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.