Switch Tahoe Reno 1 (The Citadel Campus)
Switch · McCarran, NV · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- exact
- Address as listed
- 1 Superloop Circle
- Coordinates
- 39.5140681, -119.4755145
- Serving utility, source-reported
- NV Energy
- Operational capacity, source-reported
- 130 MW
- Planned capacity, source-reported
- 650 MW
- Source record updated
- 2026-08-16
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Citadel Campus, 1 Superloop Circle, McCarran NV 89434, Storey County. Press (PRNewswire/DCD) cites e-commerce/semiconductor + AI/HPC clients at the campus.
Tahoe Reno 1, the flagship building of the Citadel Campus, opened citing up to 130MW of renewable power.
Sources and provenance
- Switch facility directory · source retrieved 2026-07-22
- OpenStreetMap way/1116775094 · source retrieved 2026-07-22
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Switch TAHOE RENO Now Open press release (130MW renewable figure for TR1) · source retrieved 2026-08-16
- Switch/Capital Dynamics groundbreaking release · source retrieved 2026-07-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.