Switch Tahoe Reno 2 (The Citadel Campus)
Switch · McCarran, NV · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- exact
- Address as listed
- 1 Superloop Circle
- Coordinates
- 39.5138706, -119.4848531
- Serving utility, source-reported
- NV Energy
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-07-24
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Confirmed operational per PRNewswire groundbreaking release and baxtel roster (Tahoe Reno 2-8).
Same Citadel Campus arrangement as Tahoe Reno 1/3: powered by the 127MW behind-the-meter Gigawatt Nevada solar+storage plant plus the 179MW Switch Station 1 & 2 solar delivered via NV Energy's special renewable tariff. 100% renewable Nevada fleet since 2016.
Sources and provenance
- Baxtel facility profile — Switch Tahoe Reno 2 (The Citadel Campus) · source retrieved 2026-07-22
- OpenStreetMap way/1116775095 · source retrieved 2026-07-22
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Switch/Capital Dynamics groundbreaking release · source retrieved 2026-07-24
- Switch sustainable data center design page · source retrieved 2026-07-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.