Switch Tahoe Reno 4 (The Citadel Campus)
Switch · McCarran, NV · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- exact
- Address as listed
- 1 Superloop Circle
- Coordinates
- 39.509868, -119.4830413
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Baxtel lists Citadel Campus Building 4 as fully operational, built 2026.
Underlying source
Source notes
Fourth building at Switch's Citadel Campus (TRIC). Tahoe Reno 1–3 are already tracked individually.
Sources and provenance
- OpenStreetMap way 1494498031: Tahoe Reno 4 (telecom=data_center, operator=Switch) · source retrieved 2026-10-14
- Baxtel: The Citadel Campus Building 4 · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.