SOURCE-LINKED U.S. REGISTRY

Switch Tahoe Reno 5 (The Citadel Campus)

Switch · McCarran, NV · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
exact
Address as listed
1 Superloop Circle
Coordinates
39.5080827, -119.4832371
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Baxtel lists Citadel Campus Building 5 as a new facility under construction, planned 2026.

    Underlying source

Source notes

Fifth building at Switch's Citadel Campus (TRIC).

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory