T5@Minneapolis (1001 Third Avenue South)
T5 Data Centers (asset owned by a Cloud Capital / Arcapita joint venture since January 2026) · Minneapolis, MN · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- exact
- Address as listed
- 1001 3rd Avenue South
- Coordinates
- 44.9714683, -93.2702827
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 21 MW
- Planned capacity, source-reported
- 31 MW
- Source record updated
- 2026-09-18
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Cloud Capital and Arcapita announced the acquisition of an operating 21 MW Minneapolis data center with a planned 10 MW expansion.
Underlying source
Source notes
PeeringDB registers "T5@Minneapolis" (T5 Data Centers) at 1001 3rd Ave South, Minneapolis 55404, with coordinates within ~10 m of the OSM "Sleep Number Building" polygon. Cloud Capital and Arcapita announced on 2026-01-13/14 the acquisition of a 21 MW Minneapolis data center "primarily leased on a long-term basis" to "a leading provider of sovereign AI and cloud inferencing solutions", plus a "planned 10 MW expansion" to 31 MW; neither release names a street address, so the identification of that asset with this building is reported, not confirmed by the acquirers. The AI classification is set from the acquirers' own description of the anchor tenant's workload.
Sources and provenance
- PeeringDB facility registry — "T5@Minneapolis", T5 Data Centers, 1001 3rd Ave South, Minneapolis MN 55404 · source retrieved 2026-09-18
- Cloud Capital — Cloud Capital and Arcapita acquire a 21-megawatt data center in the US with planned expansion (2026-01-13) · source retrieved 2026-09-18
- Arcapita — partnership with Cloud Capital to acquire a 21-megawatt data center in the US (2026-01-14) · source retrieved 2026-09-18
- FOX 9 — notes Legacy Investing previously converted the downtown Sleep Number building into a data center · source retrieved 2026-09-18
- OpenStreetMap/Nominatim geocode — Sleep Number Building, 1001 3rd Avenue South, Minneapolis, MN · source retrieved 2026-09-18
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.