T5@Silicon Valley
T5 Data Centers · Newark, CA · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 39800 Eureka Drive
- Coordinates
- 37.5461, -122.0312
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 17 MW
- Planned capacity, source-reported
- 49.1 MW
- Source record updated
- 2026-08-02
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
T5 Data Centers announced acquisition of the existing, already-operational 128,000 SF / 17MW building from a Fortune 100 enterprise (identified as a former Apple facility by secondary sources — see notes), plus a planned 32.1MW/180,000 SF expansion (49.1MW total target).
Underlying source
Source notes
Operator corrected to T5 Data Centers, not Serverfarm: Serverfarm's own current locations page does not list a Newark/Silicon Valley property, and Serverfarm has acquired only one T5 property to date (El Segundo/LAX1, tracked separately as Serverfarm LAX1 as of August 2026) - not a company-wide rebrand. T5 Data Centers remains an active, independent company. The existing 128,000 SF/17MW building (built 2002 per county assessor record) was sold by Apple to T5 in an Aug 2020 ($30M) deed transfer, announced by T5 Oct 6 2020 alongside a disclosed plan to add 32.1MW/180,000 SF (49.1MW total target); no source confirms whether that expansion has completed. The $30M figure is a real-estate acquisition price for the existing building only, not development capex, so it is not recorded as an investment figure. Apple as tenant is corroborated by secondary sources (an aggregator listing and a contractor's own portfolio page naming Apple independently) but not by a primary T5/Apple source, which refers only to 'a Fortune 100 enterprise' - flagged reported, not primary-confirmed. No AI/HPC/GPU-specific marketing found as of August 2026, so no AI classification is recorded. T5 markets this campus as 'Silicon Valley,' but Newark is geographically East Bay/Alameda County, not South Bay/Santa Clara County. Coordinates are a best-effort approximate estimate for the disclosed street address, not an independently geocoded parcel point.
Sources and provenance
- T5 Data Centers announces new enterprise data center in Silicon Valley, CA · source retrieved 2026-08-02
- T5 Data Centers announces new enterprise data center in Silicon Valley, CA (PR Newswire) · source retrieved 2026-08-02
- 39800 Eureka Dr, Newark, CA 94560 - property record · source retrieved 2026-08-02
- 39800 Eureka Dr, Newark, CA 94560 - property listing · source retrieved 2026-08-02
- T5@Silicon Valley (Newark) data center listing · source retrieved 2026-08-02
- Apple Newark data facility project · source retrieved 2026-08-02
- Serverfarm data center locations · source retrieved 2026-08-02
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.