TAC Data Centers Wythe County Campus
TAC Data Centers (The Ardent Companies) · , VA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 36.93, -80.86
- Serving utility, source-reported
- Appalachian Power
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Announced. Because Wythe County has no zoning ordinance, the project does not require rezoning approval, but will need local building permits and state environmental permits.
Underlying source
Source notes
Nine to eleven buildings totalling 3.5–4 million sq ft on roughly 1,000 acres owned by the Rogg Partnership, just southeast of I-81 about 10 miles east of Wytheville near the Pulaski County line. Distinct from the already-tracked Solis Arx Progress Park campus, which is a 99-acre lot inside Wythe County's Progress Park under a different developer and landowner. Coordinates are an approximate geocode of the described area, not a parcel-confirmed point.
Sources and provenance
- TAC Data Centers Plans Gigawatt Scale Campus in Wythe County, Virginia · source retrieved 2026-09-10
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.