SOURCE-LINKED U.S. REGISTRY

Talen Energy Montour Data Center Campus

Talen Energy · Washingtonville, PA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.05, -76.67
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-08-31

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Rezoning of roughly 1,000 acres in northern Montour County sought from agricultural to industrial; about a dozen data center buildings anticipated.

    Underlying source

Source notes

Talen is seeking to rezone approximately 1,000 acres in northern Montour County from agricultural to industrial; the company anticipates about a dozen buildings, each on two to three acres. Acreage figure is the rezoning request area, not a confirmed campus footprint, so no land area is recorded. The request has drawn substantial local opposition over land use, pollution, water and noise. No tenant has been named.

Sited beside Talen's Montour plant. DEP published notice in the August 22, 2026 PA Bulletin of an air-quality plan approval application to add two 655 MW turbine generation units at Montour 'to feed A.I. data centers'; comments were due September 21, 2026.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory